Features

Ten modules. One production date.

Every screen hangs off a date and a site. The number sales promised is the number the kitchen cooks, the vans carry and finance bills.

Sales and quotation

Quote with the margin on screen, not in a spreadsheet after

Every inquiry from the website, ads, social, phone and email lands in one queue with the source recorded. The pipeline runs new, qualified, menu proposed, negotiation, confirmed.

The proposal builder starts from a template or an ad hoc menu. A live cost panel shows material, labour, overhead, packaging and transport per head as you add dishes. Quotes below the floor margin go to a manager for approval.

  • Alternative dishes by cuisine, budget and preference
  • Availability check on every line before the quote leaves
  • One click on confirmation creates the order, work orders, requisition and proforma
Proposal QT-2026-00014, Emirates Steel HQ, 250 pax lunch
Chicken biryaniAED 6.40available
Dal tadkaAED 1.85available
Grilled hammourAED 11.20procurable
Garden saladAED 1.10available
Umm aliAED 2.30at risk

Live cost

Material22.85

Labour5.03

Overhead2.74

Packaging and transport2.08

Cost per head32.70

Price per head45.00

Margin 27.3%, above the 22% floor

Inventory and procurement

Buy exactly what the schedule needs

Requirement planning explodes confirmed orders into gross demand by item and date, nets off stock on hand and open purchase orders, and respects lead time. Requisitions group by supplier and cycle.

Daily, weekly and ad hoc cycles run side by side. A phone buy is recorded in under a minute. Goods receipt checks temperature and quality, creates the batch and runs a three-way match against the supplier invoice.

  • Live availability on every proposed dish
  • Direct-to-site or central kitchen routing per item
  • Supplier records, price lists, on-time and quality scores
Requirement run for tomorrow, netted against stock and open POs
ItemNeedStockOn POBuy
Chicken thigh212 kg96 kg80 kg36 kg
Basmati rice340 kg610 kg00
Tomato, plum88 kg31 kg60 kg0
Cooking cream42 l12 l030 l
Foil container 750 ml4,8003,1005,0000
REQ-0142 Emirates Poultry, dailyREQ-0143 Al Rawabi, dailyAd hoc, phone

Capacity

A date is sellable only when all four constraints clear

Equipment hours by section, labour hours by section, storage volume and vehicle trips are evaluated for every date. The binding constraint is named and the headroom is a number, not a feeling.

The forward calendar shows open, filling, tight, committed and blackout states. Urgent requests above capacity are blocked with the reason, alternative dates proposed, and an override needs two named approvals.

  • Weekday and weekend volume profiles
  • Staffing requirement derived from production hours
  • Equipment conflicts flagged before they reach the kitchen
Capacity, Thursday 8 October, 9,120 meals
Combi ovens91%
Chef hours78%
Chiller volume54%
Van trips66%
Tight. Ovens are the binding constraint with 9% headroom. Adding 300 covers needs two named approvals.

Kitchen and HACCP

Batch sheets by section, scaled and timed

Work orders are generated per date, meal period and section from the locked schedule. Each line carries the scaled ingredient list, the site breakdown and packing instructions. Yield and wastage are captured at the station.

Critical control points, temperature logs, retained samples, cleaning schedules and hygiene declarations are recorded where the work happens. Every container label traces back to the batch, the goods receipt and the supplier lot.

  • Kitchen tablet works offline for a full service day
  • Non-conformance from a complaint to the lot in under a minute
  • Audit packs for Dubai Municipality on demand
Batch sheet, hot kitchen, lunch, Chicken biryani

Chicken thigh63.6 kg

Basmati rice42.4 kg

Onion, fried8.5 kg

Yoghurt6.4 kg

Biryani masala1.06 kg

Saffron water0.42 l

Batch 2 of 3

424

portions, start 09:10

Core temp 76 C

CCP pass, 09:52

Label L2609000412

Aster Mankhool, 40 portions, use by 15:00

Logistics

Twenty vehicles, three meal runs, every container scanned

Trips are planned per meal period and temperature class, clustered by zone with delivery windows and vehicle capacity respected. Loading is in reverse drop order so the first stop is at the door.

The driver app shows the route, the load check and proof of delivery with signature, photo and location. Sites see the ETA. Direct-to-site supplier deliveries and returnable assets are tracked in the same place.

  • Vehicle breakdown reassigns the remaining stops
  • Fleet register with insurance, registration and service dates
  • Driver app in English, Arabic, Hindi and Malayalam
Trip TR-2026-00413, lunch, DXB A 41218, Bilal
  1. 1Aster Mankhool06:30delivered
  2. 2Aster Al Qusais06:55delivered
  3. 3Medicare Al Safa07:20arrived
  4. 4Gulf Marine HQ07:45pending
48 containers loaded in reverse drop orderHot box 64 C

People

Staff the shifts the production plan demands

The staffing requirement comes from standard times and a productivity factor, by section and date. Rostering assigns people with the right skills and certificates, respecting rest hours and weekly maximums, and shows the gap.

Attendance by biometric or geofenced app, leave, swaps and document expiry alerts at 90, 60 and 30 days. Approved hours export to payroll.

  • Visa, Emirates ID, food handler and health card expiry alerts
  • Call-in list of off-shift staff with the right certification
  • Payroll boundary: hours out, no salary calculation inside
Roster, hot kitchen, week of 5 October
SunMonTueWedThuFriSat
Anil
Beena
Rafiq
Elsa

Thursday gap

Need 296 hours, rostered 272

4 certificates

Food handler cards expire in 30 days

Point of sale

Entitlements, subsidies and cash at the same counter

Staff entitlement by badge, subsidised sale, cash sale, mess count, group dining, pre-order and department bulk. Weight-based pricing with a scale, UAE VAT receipts, and a shift close with cash variance.

The terminal serves from a local cache when the network drops. Transactions queue and sync, and offline entitlement exposure is capped so the risk is bounded.

  • Every sale becomes a consumption record for billing
  • Resale items reduce site stock
  • Android terminal or Windows till with standard peripherals
POS, Aster Mankhool, counter 1

Simplified tax invoice

Mise Demo Catering LLC

TRN 100987654300003

Chicken biryani18.00

Raita3.00

Water 500 ml1.00

Subtotal22.00

VAT 5%1.10

Total23.10

Badge 48211 entitlement18.00

Hospital subsidy 50%2.55

Card2.55

Recorded offline, queued for sync

Finance

Invoices from what was confirmed and what was consumed

Six billing models: per meal, fixed monthly, minimum guarantee plus variable, per event, cost plus fee and rate card. Each invoice carries a backing statement by date, site and payer, with approved variations and credits.

Receivables ageing, VAT at 5% with zero-rated and exempt codes, bilingual tax invoices and native connectors for Zoho Books, QuickBooks, Xero, Tally and a generic REST and CSV path.

  • Proforma raised on quote confirmation
  • Contract profitability with food, labour, transport and overhead
  • VAT return working file by period
INV-2026-00007, Aster GCC, September, backing statement
Site and periodMealsRateAmount
Mankhool, lunch15,12018.00272,160
Mankhool, breakfast12,48012.00149,760
Al Qusais, lunch18,36018.00330,480
Al Qusais, dinner13,20016.00211,200
Variation VAR-0032, Emirati day2,160

Subtotal

965,760

VAT 5%

48,288

Posted to Zoho

1,014,048

Reporting

Forecast, variance and capacity are the spine

Role dashboards for executives, sales, chefs, procurement, operations, finance and site supervisors. Thirteen core reports with drill-down to the transaction, CSV export and scheduled email.

Meal count forecasting from contracted headcount and weekday profiles, corrected by actuals, holidays and the Ramadan calendar, with accuracy tracked. Food cost variance split into price and usage. Menu engineering by popularity and margin.

  • Custom report builder over published fields
  • Read-only API for your own BI tool
  • Compliance pack on demand
Meal count forecast against actual, last 7 days
SunMonTueWedThuFriSat

Forecast error

2.1% MAPE

Food cost

31.4%

Oven utilisation

82%

Security and hosting

Your data stays in the UAE

Hosting, residency, backup and security as the RFI asks for them, section 19 of the PRD.

Hosted in the UAE

Production runs in AWS Middle East (UAE) or Azure UAE North. Primary data, backups and replicas stay inside UAE borders. Private cloud or on-premise is available if your policy requires it.

Backup and recovery

Continuous transaction log backup with point-in-time recovery. Daily snapshots kept 30 days, weekly 12 weeks, monthly 7 years. RPO 15 minutes, RTO 4 hours, second availability zone for failover, DR test reported yearly.

Encryption

TLS 1.3 in transit and AES-256 at rest. Session timeout and device policy are configurable per organisation.

Identity and access

Role-based access with site and client scope. Multi-factor authentication for privileged roles, optional for everyone. Single sign-on through SAML 2.0 or OIDC against your identity provider.

Audit and data protection

An immutable audit trail on every data change. Aligned to UAE Federal Decree-Law 45 of 2021 on personal data protection, with a documented breach notification procedure.

Assurance

ISO 27001 aligned controls, annual penetration test with a summary shared with you, 99.9% monthly uptime target and planned maintenance outside service hours with 7 days notice.

Implementation

Live in 16 to 20 weeks, value from week 7

Sales and the menu core go live first. Phases 1 and 2 start while discovery finishes, which is how the 16 week floor is reached. The 20 week figure assumes full HR and multi-site POS.

  1. 0

    Discovery and design

    Weeks 1 to 3

    Process mapping, configuration workshops, data templates issued, integration design signed off

    Signed design document

  2. 1

    Foundation

    Weeks 4 to 7

    Item master, recipes, costing engine, menu templates, client and contract setup, user roles

    Costed recipe library live, quotes priced on real data

  3. 2

    Sales and planning

    Weeks 8 to 11

    CRM pipeline, proposal builder, live costing, menu cycles, production schedule, capacity calendar

    Sales quoting in the system, schedule generated

  4. 3

    Supply and kitchen

    Weeks 12 to 15

    Inventory, procurement, goods receipt, work orders, batch tracking, HACCP records

    Kitchen working from the system, procurement schedule-driven

  5. 4

    Logistics, POS and HR

    Weeks 16 to 18

    Routes, dispatch, driver app, POS at one pilot site, employee records, rostering

    Pilot site served end to end through the platform

  6. 5

    Finance and rollout

    Weeks 19 to 20

    Accounting integration, billing cycle, POS at remaining sites, reporting suite

    Full operation live, first invoice generated from system data

  7. 6

    Hypercare

    Weeks +4 weeks

    On-site support, tuning, issue burn-down

    Handover to standard support

Training

Delivered in English and Hindi or Malayalam as the workforce requires. A train-the-trainer track builds internal capability.

AudienceFormatDuration
Sales teamClassroom plus live quoting practice2 days
Executive and section chefsOn-site, hands-on at the station3 days
Storekeepers and procurementOn-site with real receipts2 days
Operations and dispatchClassroom plus shadowing2 days
Drivers45-minute app session, in groups, in the language they use45 min each
Site supervisors and POS staffOn-terminal at the counter1 day
HR and financeClassroom plus integration walkthrough2 days
System administratorsConfiguration, user management, troubleshooting3 days

Support

Phone hotline, email, in-app ticket and a dedicated account manager with quarterly reviews. Business hours Sunday to Thursday 08:00 to 18:00 GST, critical cover from 04:00.

TierCoverageResponseResolution
Critical, service stopped24x730 minutes4 hours
High, major function impaired24x72 hours1 business day
Medium, workaround existsBusiness hours4 hours3 business days
Low, cosmetic or queryBusiness hours1 business dayNext release

Cutover

A one month parallel run on the billing cycle, so the first system invoice is checked against the manual one. Opening stock by physical count on the cutover weekend. A rollback point at every phase.

Change management

A named sponsor, a fortnightly steering committee, departmental champions from phase 0, a communication plan before each go-live and a feedback channel with published response times.

Releases

Minor releases monthly, major quarterly, security patches as needed. Notes 7 days ahead, breaking changes 30 days ahead, never during your service hours.

RFI traceability matrix

Every requirement, mapped to a section you can read

All 24 mandatory requirements are met natively. No mandatory item requires custom development. Section numbers refer to the Mise product requirements document.

Section 4 requirements

M is mandatory, D is desirable.

RFI refRequirementPriorityPRD section
4.1.1Consolidate inquiries from web, ads, social, phoneMandatory6.1
4.1.2Generate proposals from templated or ad-hoc menusMandatory6.4, 7.3
4.1.3Live food cost while building a menuMandatory6.5, 7.2
4.1.4Invoice generation on quotation confirmationMandatory6.7, 14.2, 14.6
4.1.5Share finalised menu with kitchen and operationsMandatory6.7, 10.1
4.1.6Propose alternative dishes by cuisine, budget, preferenceMandatory6.6
4.2.1Reusable menu templates linked to daily productionMandatory7.3, 7.5
4.2.2View and select from the menu scheduled for a dateMandatory7.6
4.2.3Rotating 4 to 5 week cycles across meal periodsMandatory7.4
4.2.4Searchable database of 1,000 to 1,200 items including unscheduledMandatory7.1, 6.6
4.2.5Kitchen staff upload and maintain recipesMandatory7.8
4.2.6Similar menus across adjacent datesDesirable7.7
4.2.7Recipe-level costing to raw material and portion costMandatory7.2
4.3.1Real-time stock check on proposed dishesMandatory8.3
4.3.2Daily, weekly and ad-hoc procurement cyclesMandatory8.4
4.3.3Direct-to-site versus central kitchen routingDesirable8.5, 11.6
4.3.4Supplier records, pricing, purchase history for 1,000 to 1,200 SKUsMandatory8.6
4.4.1Forward capacity visibility by dateMandatory9.1, 9.2
4.4.2Upcoming dates with guest counts, staffing, equipmentMandatory9.3, 12.5
4.4.3Support 8,000 to 9,000 meals with weekday and weekend variabilityMandatory9.5, 19.2
4.4.4Dynamic linked view across all planning dimensionsMandatory9.4
4.5.1Delivery scheduling and routing for ~20 vehiclesMandatory11.2, 11.3
4.5.2Track kitchen-to-site and supplier direct-to-site deliveriesMandatory11.5, 11.6
4.5.3Driver-facing mobile viewDesirable11.4
4.6.1Staffing records for ~270 employees across locationsMandatory12.1
4.6.2Link catering volume to staffing and equipment planningMandatory12.2, 12.5
4.6.3Shift and roster scheduling aligned to productionDesirable12.3
4.7.1Accounting integration for automatic invoicingMandatory14.2, 14.6
4.7.2Open API for accounting, HR and fleetMandatory18.2, 18.3
4.7.3Multi-entity and multi-site reporting across segmentsDesirable5.3, 14.5, 15.2

Section 5 vendor questions

Where the answer comes from.

RFI refQuestion topicPRD section to answer from
5.1.1Company overview and client countCompany profile document, not this PRD
5.1.2Purpose-built for contract catering or adapted2.3, 5.2, 9.1
5.1.3Reference clients of comparable scaleReference sheet, not this PRD
5.1.4Cloud, on-premise or hybrid, data residency19.1
5.2.1Inquiry to proposal to quotation to invoice to work order in one workflow16.1, 6.7
5.2.2Date-based menu templates linked to live production7.3, 7.5, 7.6
5.2.3Recipe-level real-time costing and cost inputs6.5, 7.2
5.2.4Reusing similar menus across adjacent dates7.7
5.2.5Forward capacity planning and committed-date flagging9.1, 9.2
5.2.6Live inventory check and procurement flagging8.2, 8.3
5.2.7Native fleet and delivery scheduling11.1 to 11.5, native
5.2.8HR and staff scheduling native or integrated12, native with payroll export
5.2.9Multiple business lines in a single instance5.3
5.2.10Reporting for meal forecasting, cost variance, capacity15.2, 15.3
5.3.1Native accounting integrations14.6
5.3.2Documented API18.2, 18.3
5.3.3Data migration support18.4
5.3.4Mobile capability and offline mode10.7, 11.4, 13.3, 19.5, 19.7
5.3.5Uptime SLA, backup, disaster recovery19.2, 19.3
5.4.1Implementation timeline at this scale20.1
5.4.2Training and change management20.3, 20.4
5.4.3Post-go-live support model20.5
5.4.4Release cadence and communication20.6
5.5.1Pricing model and indicative costAnnexure A, not this PRD
5.5.2One-time implementation feesAnnexure A, not this PRD
5.5.3Contract term and data export at exitCommercial terms, data export covered by 18.2

Want the matrix as a document for your response? Ask us and we will send it.

Stop planning 9,000 meals in a spreadsheet

A 45 minute walkthrough with your own menu, your own sites and your own numbers. We bring the sample data, you bring a real date.